Very productive Saturday! I’ve started adding the track feeders, switch machines and block detectors to the first staging yard board. So far I have added the feeders for the detected blocks (orange for the Freight yard, and yellow for the Metra yard), installed two Digitrax BDL168 block detectors (one for […]
LAYOUT UPDATE: Tracking laying on Board 1 almost finished
2nd evening of track laying, and I’ve almost finished laying the track on the first board of the lower staging yard. All the turnouts are laid, and I just have a few pieces of flex track to lay. I’ll lay these once I have re-installed the board on the wall […]
LAYOUT UPDATE: Track laying starts!
I’ve finally started laying track! Tonight I laid almost half the track for the lower freight siding – so almost one of the 6ft boards. Tomorrow I will lay the track for the Metra yard on this board, and then put the two layout boards together so I can run […]